Project Titles:
1- Investigating the status of using the effluent from the municipal sewage treatment plant in Mahalat Greenhouse
Client: Arghvan Cooperative Company, Gol Mahalat Village _ Project Manager: Mr. Engineer Khademi – year 2017
2- Plan to investigate and remediate the water supply system of Shahristanak village
Employer: Dehiari village of Shahristanak – year 2018
3- Water transmission line between the reservoirs of the Shirvan treatment plant and Ziarat reservoir
Client: North Khorasan Province Water and Sewerage Company _ Project manager: Mr. Engineer Amiri – year 2018
4- Equipping well No. 2 and transmission line of Ghoshkhaneh city
Client: North Khorasan Province Water and Sewerage Company _ Project manager: Mr. Engineer Amiri – year 2018
5- Water distribution network development plan of Arkan Bojnord administrative town
Client: North Khorasan Province Water and Sewerage Company _ Project manager: Mr. Engineer Pourashaq – year 2019
6- Carrying out studies on the design of the 300 cubic meter reservoir of Khosrowieh in Faruj city
Client: North Khorasan Province Water and Sewerage Company – Project Manager: Mrs. Engineer Dehghan – 1399-1400
7- Carrying out studies on supplying, equipping wells, improving and expanding the facilities of transmission lines and water distribution network and reservoirs in Shirvan city.
Employer: North Khorasan Province Water and Sewerage Company – Project Manager: Mrs. Eshghi Engineer – 1399-1400
8-Studies of the first phase of the water transfer project to the rural complex of Galian
Employer: North Khorasan Province Water and Sewerage Company – Project Manager: Ms. Butegi Engineer – 1399-1400
9- Water supply to the villages of Hesar Garmkhan sector
Client: North Khorasan Province Water and Sewerage Company – Project Manager: Mr. Pourashaq – Year 1399-1400
10- Preparation of instructions for the construction of pumping stations (Abdullah Abad pumping station)
Employer: North Khorasan Province Water and Sewerage Company – Project Manager: Ms. Butegi Engineer – 1399-1400
11- Preparation of technical rules and criteria for prioritizing water transmission line reconstruction operations
Client: North Khorasan Province Water and Sewerage Company – Project Manager: Mrs. Engineer Tavakoli – 1399-1400
12- Preparation of technical standards and criteria for evaluating the operation of water transmission systems
Client: North Khorasan Province Water and Sewerage Company – Project Manager: Mrs. Engineer Tavakoli – 1399-1400
13- Carrying out studies on supplying, equipping wells, modifying and developing facilities for transmission lines and water distribution networks and reservoirs in Bojnord city.
Employer: North Khorasan Province Water and Sewerage Company – Project Manager: Mr. Pourashaq Engineer – year 1400
14- Carrying out studies to increase the capacity of the Kowsar treatment plant up to 4.5 cubic meters per second and the stability of the treatment plant facilities along with the preparation of tender documents and executive plans
Client: Persian Gulf Water Supply Management Company – Project Manager, Mr. Engineer Tagvi, year 1401
15- Studies of the 20 thousand cubic meter drinking water storage concrete tank of the treatment plant site and cathodic protection studies of the water supply transmission line of the Persian Gulf
Employer: Persian Gulf Water Supply Management Company – Project Manager, Mr. Eng. Taghavi – year 1402
16- Preparation of tender documents for the purchase of reverse osmosis water treatment plant system to reduce water impurities in wells located in the western villages of Tehran province.
Client: Southwest Water and Sewerage Company of Tehran Province – Project Manager Mr. Engineer Taj in 1402
17- Supervising the purchase of a water treatment plant system to reduce the amount of arsenic in drinking water wells located in the western villages of Tehran province.
Employer: Southwest Water and Sewerage Company of Tehran Province – Project Manager, Mr. Engineer Ahmadipour – year 1402
18- Engineering services of the emergency water supply plan for the city of Barazjan (water treatment plan)
Employer: Bushehr Province Water and Sewerage Company – Project Manager Mr. Engineer Karimi – year 1403
19- Engineering services for studies and estimation of amounts in Article 11 of the Law on the establishment of water and sewage companies for the cities of Bushehr province (43 cities)
Employer: Bushehr Province Water and Sewerage Company – Project Manager Mrs. Engineer Keshavarz – year 1403